Search This Blog

Sunday, May 22, 2016

Estimates are Usually Guesstimates!

I have been burned more times than I can count by bad estimates. What can a project manager do to help ensure the accuracy of estimates?  First we should understand the basics behind the estimating process (there are many more than I have listed here). Some are:

• The more unique , complex, or larger the project, the more of a challenge it will be to get good estimates 

• Estimates are only as good as the estimator is at predicting the future 

• "Padded" estimates are not always bad as long as the padding is communicated (... and as long as the Project Manager is the one doing the "padding") 

• An estimate is not a bid

• Estimates using sound estimating practices, performed by experienced estimators from clear specifications should never be negotiated 

• Ballpark estimates are guesses and should be treated as much by the project team, management, and the project sponsor

Other items to consider when estimating are:

• Ensure the statement of work or contract is clear and understood by the person(s) doing the estimates 

• Ensure that a schedule or mandated date doesn't drive the estimating thought process 

• Include Risk Management in the estimating process 

• Ensure that estimates take into account the skill level(s) of the person(s) that will do the work 

• If your work breakdown structure (WBS) is flawed, your estimates will be inaccurate

Accurate estimating is an art and a science. The estimator (or team) must take into account historical data from past projects, the team's knowledge and experience, the project risks, the statement of work and other project information to make the best estimate possible.

Keep in mind when planning your project that estimates aren't hard and fast numbers. They are guesses, however they should be very good guesses if you have good estimators and are following tried and true estimating practices. 

Wednesday, March 02, 2016

Your Must Fail to Succeed!

If you are an "experienced" project manager and haven't had a few project failures, in my mind, you aren't a very good project manager. Project managers must constantly push their team members towards exceeding their comfort levels, take (calculated) risks, be decisive, make firm commitments, and be aggressive when base-lining and managing the triple constraints (Time, Cost, Quality). Just like a successful NASCAR driver, a project manager must learn to live close to the edge of disaster, but while doing so, he or she must aggressively manage their project’s Risks. 

In my opinion, too many project managers are unwilling to set firm expectations with their team for fear of being unpopular. There are going to be times when your project team doesn't really care if a milestone is missed or a promise isn't kept. The problem is your project isn't always your team’s top concern. Don’t forget that. You live with and for your project and at the same time some of your team members might loathe your project. Many team members have other responsibilities outside of your project and your project may be preventing them from doing their regular job. 

Project Tip - If you find that you have members on your project team that aren't 100% committed to achieving the goals of your project, you need to start thinking about replacing them. 

Based upon my experience, - at least on IT projects - most project problems that are encountered in the Project Execution phases are the fault of the project manager. Proper Risk Management will help the project manager foresee and mitigate many problems that will arise during project execution. If you have lots of problems and issues on your project you did a poor job of Risk Management in the planning phase. 


Some things to keep in mind to avoid failure when planning your project: 

Be crystal clear when communicating with your team. All important communications should be in writing. 

Don't allow project committees or executive oversight groups to dictate how you plan your project. 

Communicate quickly to your team and senior management if you believe that your project is out of control. 

Don't assume that suppliers or vendors will be honest with you. Make sure you continually follow-up and get commitments in writing (preferably in the contract). 

Split your project into manageable phases. 

Ensure that your end users are involved every step of the way. 

Communicate Status as often as is needed. Include bad news, problems, issues, and concerns in your status report and be sure to include how you plan to overcome them. 

Don't let your project fail because you aren't communicating or your team isn't functioning properly. 

Believe in the statement that “Project failure is always the Project Manager's fault”! 

Tuesday, February 16, 2016

The Absent Executive - replayed

Ever had a project that begins with strong executive/senior management support and over time that support fades?

The symptoms of executive disintrest are:

Executives/senior management don't ask questions during status meetings or stop coming to the meetings

Executives/senior management lack a sense of urgency regarding "your" project

Executives/senior management become more confused and/or less supportive over time regarding project goals and objectives

Executives/senior management begin to focus on what has been "installed" vs. what business results have been realized

The project sponsor(s) becomes detached and less available for project updates

Executives, sponsors, and stakeholders start to forget the culture and try to force solutions to meet deadlines

I know first hand that executives/senior management will tell you they support your project, and then turnaround and encourage resistance in their departments, and allow or ignore passive-aggressive behaviors of key staff members regarding the project's goals and objectives. What can be done? Here are some ideas; however you must realize that your project is in serious trouble if you have observed the behaviors listed above.

Calculate the costs of the project so far. Consider scaling back the project or killing it all together. I know from experience that this is much easier said than done.

Identify key executives and stakeholders and meet with them personally and restate the projects benefits. If they still aren't sold or supportive, move on to the next group. Ensure you create a Scope Change and de-scope portions of the project that aren't getting support.

Reevaluate the project team. Do you need new people? Are they really focused on meeting the project's objectives and scope? Are the project's objectives and scope still realistic, attainable and relevant?

Reevaluate the organization's culture and re-plan the project if needed. Reset expectations, and identify sources of resistance. If the culture can't be changed quickly, perhaps the project's objectives, goals, and/or scope need to be adjusted.

Remember, project failure rests on the project manager's and project sponsor's shoulders. Sometimes senior management is too busy to get or stay involved, however that doesn't release them from their responsibility to support your project. Determine if they are too busy or just too lazy to support your project. Not easy to do, but absolutely necessary.

Remember what Dr. Stephen Covey says is the 4th Discipline (The 4 Disciplines of Execution) - "Hold Each Other Accountable - All of the Time". If you are a project manager it is your job to hold all levels of the organization accountable for project success. Having said that, you must proceed with caution if you plan to do this with executives. Be tactful and respectful; however, don't let them off the hook!

A recent survey found that only 39 percent of workers feel highly energized and committed to their organization's most important goals. This survey includes executives and senior managers. Just because they have the title doesn't mean they will behave responsibly or be focused on doing the right things right!

Executives, senior management, and your project sponsor(s) may say they support you and your project, but it is up to you to figure out if they really are being supportive. Silence is not acceptance when it comes to dealing with the decision makers. When they stop asking questions, you are in deep trouble.

Monday, October 19, 2015

The Seven Step Path to Sustaining Project Success

Tom Peter's Wisdom!


You take care of the people.
The people take care of the service.
The service takes care of the customer.
The customer takes care of the profit.
The profit takes care of the re-investment.
The re-investment takes care of the re-invention.
The re-invention takes care of the future.
(And at every step the only measure is EXCELLENCE.)


More project wisdom at www.tompeters.com 

Thursday, August 27, 2015

Tom Peters!

The Top 27: Twenty-seven Practical Ideas That Will Transform Every Organization

1. Learn to thrive in unstable times—our lot (and our opportunity) for the foreseeable future.


2. Only putting people first wins in the long haul, good times and especially tough times. (No "cultural differences" on that one! Colombia = Germany = the USA.)

3. MBWA/Managing By Wandering Around. Stay in touch!

4. Call a customer today!

5. Train! Train! Train! (Growing people outperform stagnant people in terms of attitude and output—by a wide margin.)


6. "Putting people first" means making everyone successful at work (and at home).

7. Make "we care" a/the company motto—a moneymaker as well as a source of pride.

8. All around the world, women are an undervalued asset.

9. Diversity is a winning strategy, and not for reasons of social justice: The more different perspectives around the table, the better the thinking.

10. Take a person in another function to lunch; friendships, lots of, are the best antidote to bad cross-functional task accomplishments. (Lousy cross-functional communication stops companies and armies alike.)

11. Transparency in all we do.

12. Create an "Innovation Machine" (even in tough times). (Hint: Trying more stuff than the other guy is Tactic #1.)

13. We always underestimate the Innovation Advantage when 100% of people see themselves as "innovators." (Hint: They are if only you'd bother to ask "What can we do better?")

14. Get the darned Basics right—always Competitive Advantage #1. (Be relentless!)


15. Great Execution beats great strategy—99% of the time. (Make that 100% of the time.)

16. A "bias for action" is a "bias for success." (Great hockey player Wayne Gretzky: "You miss 100% of the shots you don't take.")

17. No mistakes, no progress! (A lot of fast mistakes, a lot of fast progress.) (Australian businessman Phil Daniels: "Reward excellent failures. Punish mediocre successes.")

18. Sometimes "little stuff" is more powerful than "big stuff" when it comes to change.

19. Keep it simple! (Making "it" "simple" is hard work! And pays off!)

20. Remember the "eternal truths" of leadership—constants over the centuries. (They say Nelson Mandela's greatest asset was a great smile—you couldn't say no to him, even his jailors couldn't.)


21. Walk the talk. ("You must be the change you wish to see in the world."—Gandhi)

22. When it comes to leadership, character and people skills beat technical skills. (Emotional Intelligence beats, or at least ties, school intelligence.)

23. It's always "the little things" when it comes to "people stuff." (Learn to say "thank you" with great regularity. Learn to apologize when you're wrong. Learn the Big Four words: "What do you think?" Learn to listen—it can be learned with lots and lots of practice.)


24. The "obvious" may be obvious, but "getting the obvious done" is harder said than done.

25. Time micro-management is the only real "control" variable we have. (You = Your calendar. Calendars never lie.)

26. All managers have a professional obligation to their communities and their country as well as to the company and profit and themselves. (Forgetting this got the Americans into deep trouble.)

27. EXCELLENCE. ALWAYS. (What else?)


Tuesday, August 12, 2014

Ten Project Ideas from Florida Power and Light



Florida Power and Light management came up with the list below of the ten most important things they think helped them complete the St. Lucie 2 Nuclear Power Plant on schedule, within cost, and without major quality issues.

  1. Management Commitment
  2. A realistic and firm schedule
  3. Clear decision-making authority
  4. Flexible project control tools
  5. Teamwork
  6. Maintaining engineering before construction (design before build)
  7. Early start-up involvement
  8. Organizational flexibility
  9. Ongoing critique of the project
  10. Close coordination with the Nuclear Regulatory Commission (strong, fair oversight)
This is an awesome list that can be adapted to any environment and project.  Do you have a top ten list of things you need for your project to be successful?

Sunday, June 22, 2014

Principles are Lacking

Principles are mile posts that help to guide our conduct. They come from natural laws that are recognizable by all cultures. Principles have been around since the dawn of time. They are timeless and aren’t dependent on us making them a permanent part of our lives.

Big problems cannot be solved by small people and small mindedness. Remember, principles aren’t values. The Mafia has values, but their practices certainly aren’t related to principles. As Stephen Covey say’s “Principles are the territory. Values are the map”.

Saturday, June 14, 2014

Wisdom and the Project Manager

Albert Einstein said "A clever person solves a problem; a wise person avoids it". After reading this quote, it reminded me that project managers spend a lot of time (or should be) avoiding problems. One thing that can help project managers to avoid problems is following a defined process, or more specifically, a Project Management Methodology (PMM). At its core a PMM is a set of agreed-upon processes that assists project managers to deliver predictable project outcomes.

To create a PMM you need to define all project management processes, procedures and policies used to deliver your organization's projects. Also, don't forget to develop or obtain a set of project templates as they are an important part of any PMM. Finally, you must develop a training program to introduce and educate your organization about the new PMM.

KEY POINT - When developing a PMM ensure you include input from your lead project managers and any other personnel that have a stake in your project management outcomes.
Once your PMM is implemented ensure you measure the results and make adjustments where necessary. If you need help in developing your PMM there are many products that can assist you and your organization to develop a custom PMM that works for you.

Saturday, June 07, 2014

Tuesday, June 03, 2014

Wow Culture

 Zappo's Ten Corporate Values

Deliver “WOW!” through service


Embrace and drive change

Create fun and a little weirdness

Be adventurous, creative and open-minded

 Pursue growth and learning

Build open and honest relationships with 
communication

Build a positive team and family spirit

Do more with less

Be passionate and determined

Be humble

Source: Delivering Happiness, Tony Hsieh, CEO, Zappos.com            

Monday, May 26, 2014

Great Project Managers

I have a book entitled “What Makes a Good Project Manager” by James S. Pennypacker and Jeannette Cabanis-Brewin. In the book, there is a reference to a 2001 ComputerWorld article that discusses “The Perfect Project Manager”. The consensus of the article was in the world of Information Technology (IT) there are three general areas of Project Management competency: Technology, Business, and Behavior (in no certain order).

One of the CIOs interviewed in the ComputerWorld article stated “in order to motivate IT workers, you need … an understanding of human behavior and how to motivate teams.” Do not miss this important point. Project Managers are primarily team leaders, motivators, and communicators. Project Managers will not be successful managing IT projects if they do not have an understanding of basic human behavior.

It has also been determined there are three Project Management skills that are required for success in IT:

General Management Skills

Project Management Skills

IT Management Skills

Under General Management, the key areas of expertise are (not in order):

Thinking Skills

Organizational Awareness

Leadership

Interpersonal Relations

Communication Skills

Many companies are now interviewing Project Managers placing a heavy emphasis on character traits versus professional competencies. These companies realize if a Project Manager cannot get along well with others and have poor communication skills they will not be successful.

The key to project success is having a competent project manager and the number one competency of a project manager is honesty. Research has shown that projects are more likely to fail because the human elements are not managed. In order to mitigate this type of risk project managers need to develop skills that support sound decision-making, good communications, motivational techniques, and conflict management.

Sunday, May 18, 2014

Off the Cuff: Tom Peters on Front Line Managers

Project Management Politics

Politics is the art of getting things done (influencing).  

As Tom Peters say's “No Politics = No Implementation”.

  Develop powerful allies in your organization to help you get your project implemented.  Be sure to show appreciation to all those people that help you along the way.

Friday, May 16, 2014

You Aren't Communicating!


When project teams are surveyed at the end of failed projects, poor communications is always cited as being one of the major causes. Why does this keep happening? Why is project communications so poorly executed so often?  My short answer is that many project managers are arrogant, inattentive, and oblivious to the feelings and needs of the project team.

Project managers get busy. Many times they don't make time to manage project communications properly. Also, the project manager may think they are doing a good job communicating, but that may not be the case.

Project managers must remember that the project team is made up of individuals. Each person on the team has a preference for the types of communication they like to receive, and each person processes communications differently.

Some things to monitor that may point to poor project communications are:

Trust - Does the team trust you (the project manager)? How do you know? Everybody will not trust you all the time. Team members that don't trust the project manager will not be open in their communications. They will tend to either shut down or challenge the project manager at every turn.

De-motivated - Where are we going? Are we going where we said we were going when we started? Did we clearly state where we were going before we started?

Whining - Despair and anxiety take over the team or key team members. Infighting is prevalent and people are starting to talk openly about the project being a failure.

Incompetence - Team isn't sharing information and learning. Perhaps the team has had little to no training, or the training received was of poor quality.

All the above can be overcome, however it requires that the project manager is listening and changing strategy when necessary to get the team back on track. Just because you are a project manager doesn't make you a good communicator, however ignoring problems like the ones mentioned above will make you a bad project manager.

My two cents are, be a leader. Lead through your communication and your ability to motivate your team to get the job done. Be on the lookout for the above warning signs. When you see signs of the warning signs act quickly, follow-up, then continue to monitor.

Poor project team synergy is the fault of the project manager. There are a lot of incompetent project managers that are hurting our profession because they either refuse to alter their communication styles or are too arrogant to change. My advice to them is to change their ways or leave the project management profession.

Thursday, May 08, 2014

Ignore your Detractors!


Tom Peters a highly regarded speaker and writer said it best in his book The Project 50, “as project managers we should not try to convert our project enemies by overcoming their objections” and I would add through appeasement. Tom states “we should set out to surround and marginalize them; additionally, the most effective change agents ignore the barbs and darts, their time is spent on allies and likely allies”.

It seems to be in our nature to take on those that oppose us, particularly if they have been attacking us behind our backs. This taking on of the opposition is a waste of valuable project time and detracts the project manager from the task at hand. All projects will have detractors, whiners, and complainers. Don’t waste your time trying to convince them of the error of their ways. Let your project’s results answer your critics!

As project managers we need to spend our time working with our advocates and supporters, not answering our critics. If you say you don’t have critics on your project than I say you probably aren’t a very good project manager. The project manager that has friends everywhere on his projects is usually trying to satisfy everyone, and many times at the end of their project – if it ever ends – there will be low overall satisfaction due to all of the tradeoffs that were made between all of the competing interests.

When you push people, demand excellence, set deadlines, push for quality, hold individuals accountable, and are firm on agreed upon commitments you are going to ruffle some feathers. Get over it, and realize no matter what you do on your project there will always be detractors. Just don’t let the detractors sway you from implementing your project on time, on budget, within requirements, and most importantly with a satisfied customer as your biggest fan.

Sunday, May 04, 2014

Mark Goulston, MD writes:
A toxic person...
    1. Interrupts.
    2. Doesn’t take turns.
    3. Takes advantage of people who are down.
    4. Gloats in victory.
    5. Is sullen in defeat.
    6. Is not fair.
    7. Lacks integrity.
    8. Is the kind of person you’ll avoid if you possibly can.

Three good responses to nearly every type of toxic person...
"Huh?" This one word can stop a jerk in his tracks. Use a mild, neutral tone of voice. Do this when the toxic person says something utterly ridiculous but acts as if he is being perfectly reasonable. This response conveys that what the toxic person is saying doesn’t make sense. It works because it signals that you are not engaging with the content of what he said.
"Do you really believe what you just said?" Use a calm, straightforward tone, not a confrontational one. This question works because toxic people often resort to hyperbole to throw others off balance. They are prone to using the words "always" and "never" to drive home their points. However, don’t expect the toxic person to admit that he is wrong. He is more likely to walk away in a huff -- which is fine because then you won’t have to waste more energy dealing with him.
"I can see how this is good for you. Tell me how it’s good for me." This response is a useful way to deal with a toxic person’s demands. If he stalls or changes the subject, you can say, "Since it’s not clear how this is good for me, I’m going to have to say no."

We say these things?


Wednesday, April 23, 2014

Project Management Quotes

Some are a little off the wall, but many are spot on...

Good estimators aren't modest: if it's huge they say so.

The sooner you begin coding the later you finish.

A verbal contract isn't worth the paper it's written on.

What is not on paper has not been said.

If you don’t know where you’re going, any road will take you there.

If you fail to plan you are planning to fail.

If you don't attack the risks, the risks will attack you.

A little risk management saves a lot of fan cleaning.

The sooner you get behind schedule, the more time you have to make it up.

A badly planned project will take three times longer than expected - a well-planned project only twice as long as expected.

If you can keep your head while all about you are losing theirs, you haven't understood the plan.

When all's said and done a lot more is said than done.

If at first you don't succeed, remove all evidence you ever tried.

Feather and down are padding - changes and contingencies will be real events.

There are no good project managers - only lucky ones.

The more you plan the luckier you get.

A project is one small step for the project sponsor, one giant leap for the project manager.

Good project management is not so much knowing what to do and when, as knowing what excuses to give and when.

If everything is going exactly to plan, something somewhere is going massively wrong.

Everyone asks for a strong project manager - when they get him they don't want him.

Overtime is a figment of the naïve project manager's imagination.

Quantitative project management is for predicting cost and schedule overruns well in advance.

Good project managers know when not to manage a project.

Metrics are learned men's excuses.

For a project manager overruns are as certain as death and taxes.

If there were no problem people there'd be no need for people who solve problems.

Some projects finish on time in spite of project management best practices.

Good project managers admit mistakes: that's why you so rarely meet a good project manager.

Fast - cheap - good: you can have any two.

There is such a thing as an unrealistic timescale.

The more ridiculous the deadline the more money will be wasted trying to meet it.

The first 90% of a project takes 90% of the time the last 10% takes the other 90%.

The project would not have been started if the truth had been told about the cost and timescale.

To estimate a project, work out how long it would take one person to do it then multiply that by the number of people on the project.

Never underestimate the ability of senior management to buy a bad idea and fail to buy a good idea.

The most successful project managers have perfected the skill of being comfortable being uncomfortable.

When the weight of the project paperwork equals the weight of the project itself, the project can be considered complete.

If it wasn't for the 'last minute', nothing would get done.

Nothing gets done till nothing gets done.

Warning: dates in the calendar are closer than you think.

There is no such thing as scope creep, only scope gallop.

Anything that can be changed will be changed until there is no time left to change anything.

If project content is allowed to change freely the rate of change will exceed the rate of progress.

If you can interpret project status data in several different ways, only the most painful interpretation will be correct.

A project gets a year late one day at a time.

A project isn’t over until the fat check is cashed.

Powerful project managers don't solve problems, they get rid of them